Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.
I don’t know why, but I’ve never thought of the transport logistics involved in building a semiconductor fabrication plant.
If it makes you feel any better it’s probably Google that’s failing, not you
Even before Google stopped working, I’m not sure the results of googling “super load” would have been what you are looking for.
Try “super loads AND when they are coming?”
site:reddit.com Columbus super load
Look at the bright side, once intel gets this new plant up and running cranking out next-gen chips, Google will be able to fail you even faster!