• DieguiTux8623@feddit.it
    link
    fedilink
    arrow-up
    22
    ·
    1 year ago

    The worst case is when someone requires changes, you address them, but then they disappear/go on a leave.

    If the repository rules require all conversations to be resolved before merging and only the original reviewer can mark them as solved, the PR is stuck forever even if the rest of the team approves it.