• 0110010001100010@lemmy.world
    link
    fedilink
    arrow-up
    19
    ·
    1 year ago

    At my previous role, I ALWAYS wanted to be onsite at the datacenter if I was doing upgrades of critical systems. I’d sit in the lobby where it was quiet instead of on the datacenter floor but there was comfort knowing that if a button needed pushed I didn’t have to drive 30 minutes to do it.